Find feasibility risks before committing the build

A shaped solution looks coherent, but an unresolved design, technical, contractual, or regulatory dependency could invalidate it.

“This could consume scarce team capacity if a critical assumption fails after commitment.”

The result you need

Answer, isolate, or stop for each critical dependency before the build receives commitment.

What is happening now

Where the work gets stuck

An entrepreneur in residence or product lead has a shaped solution with consequential assumptions still open.

When it starts
The team is preparing to commit delivery capacity.
What makes it difficult
An assumed solution can survive planning and fail only after the team starts building under deadline.
What progress looks like
Every critical dependency has evidence, a bounded spike, a qualified owner, or a recorded stop decision.

What to try next

Run a product feasibility walkthrough before commitment

Resolve, isolate, or stop for the dependencies most likely to invalidate the shaped solution.

Open the practice

Before you act

Check these limits

  • Include design, technical, legal, contractual, operational, and regulatory review where they apply.
  • Do not use a numerical risk score as proof.
  • Ask qualified specialists to review risks outside the team’s competence.